The crushing plan is situated at Pandansari Cenko Processing Plant (CPU), Tanah Laut District, South Kalimantan. This CPU become priority activity of coal mining, processing plant, loading port and trading for Cenko.
Crushing plan capacity is 5,000 mt per day crushing unit installed in the 30 hectare since October 2000. At 2003-2004 CPU installed 2 unit crushing plant capacity 5,000 mt per day each. CPU works 24-hour continuously of stockpiling, crushing, and loading. This area can accommodate 400,000 mt ROM and crushed coal at the same time. Within conveyor system, product convey and loaded +500 meter on barge loading facility at the same area.