Loading Port & Capacity

The distance from mine to processing is approx 35 km, and processing - port in same area (500 meter).
At CPU Pandansari also installed the Cenko Port Loading facility in same location with the distance around 500 meter. The facility equipped conveyor system with 2 anchorage.

Capacity of loading per barge at approximate 5,000 mt per day simultaneously (totally 10,000 mt minimum).
The coal can load onto barge up to 8,000 mt (300 feet). The anchorage also capable to load LCT for DWT 4 meter.








Trans-Shipment and Vessel Anchorage

The distances of Trans-Shipment (Loading Port to Vessel Anchorage) is around 16-18 nautical miles (knot) or around 8-10 hour barge sailing.
Vessel Anchorage point is Muara Satui open sea, South Kalimantan The vessel capacity at anchorage point open sea is up to 130,000 mt.

Loading Coordinate at Muara Satui Anchorage location:

03° 56' South 115° 31.5 East
Draft: 9.5 meters

03° 58' South 115° 32.5 East
Draft: 14 meters


Floating Crane & Capacity

To load the coal from barge to vessel use the Floating Crane. The Capacity of Floating Crane is around 10,000 mt per day.
We have shipping companies in Indonesia as our partner for supporting floating crane facility.


Coal Terminal Facility

There are 2 coal terminal facility around the CPU 2 Pandansari: Coal Terminal IBT (Indonesia Bulk Terminal) and BCT (Balikpapan Coal Terminal).

IBT coal terminal located at Kotabaru district, South Kalimantan was around 8 – 10 hour barge sailing. This coal terminal capacity around 15,000 mt per day can loaded into vessel gearless.

BCT coal terminal located at Balikpapan district, East Kalimantan was around 15 – 18 hour barge sailing. This coal terminal capacity around 20,000 mt per day can loaded into vessel gearless.
 